Building a raku kiln shelter
Cut trees for shelter to go on pre - existing concrete pad and deck for a hot tub.
Cemented poles 3 ft.in the ground.
Then bolted together.
Nailed on tin foof with a 12 inch drop for water / snow run off. 
Removed legs from deck, then moved and leveled for my reduction cans.  Hired propane guy to plumb kiln to a 250 gal. tank. And dug a 18 inch deep trench for flex line myself.  Hooked up kiln then graveled around pad.
The kiln area over looks our 1 acre mountain pond.  A nice place to cool off after unloading the kiln...
Kirk McGuire Raku
<---Back
Created rock garden then, leveled area for metal building for kiln storage, supplies etc.
Put together shed on a gravel foundation. Finished!